re.dicu-lous

pratt B/C/V/C/B summer design studio

mapping: example

mississippiHarold Fisk’s Mississippi and its changes over time in 1944. This is an important diagram/map because it is keeping with the idea of a changing water mass and time that are important in our site studies with the flood plain of Tonle Sap.

Filed under: Inspiration, Phase 3, Site Analysis + Proposal

Leave a Reply